Skip to content
AI Sales Engineering for Manufacturers

Quote More Jobs. Win More Business.

HorizonStack turns complex RFQs, drawings and past projects into engineer-reviewed quotes.

Assembly line on a factory floor with operators working beside an automated cell
RFQ-2611 · Valve housingIllustrative
Overall progress58%
  1. ReceivedComplete
  2. Requirements checkedComplete
  3. Missing details resolvedComplete
  4. CostedIn progress
  5. Engineer approvedAwaiting
  6. QuotedAwaiting
> Unit price $163.20 from Quote_2415 baseline
How it works

From RFQ to Quote. Without the Back-and-Forth.

  1. 01

    QUALIFY

    Read new RFQs, extract requirements and flag missing information.

  2. 02

    ENGINEER

    Check technical feasibility, product configurations and previous designs.

  3. 03

    QUOTE

    Build BOMs and pricing using approved costing rules.

  4. 04

    CLOSE

    Prepare proposals, route approvals and track customer follow-ups.

An RFQ looping through four stages: receive, engineer, configure and quote, ending in engineer approval.QUALIFYENGINEERQUOTECLOSESTAGE 01QUALIFY14 requirements, 1 gap
RFQ-2417 · Automated packaging line · 120 bpmEngineer approval
The product

Every RFQ. One Place.

Illustrative example. Not a customer project.

RFQ-2611 · Stainless steel valve housing

RFQ received from purchasing

DocumentTypePagesStatus
RE: RFQ valve housing, 120 pcsCustomer email1Read
ValveHousing_RevC.pdfTechnical drawing2Read
Inspection_Requirements.pdfQuality spec3Read

3 documents · due in 5 working days

Engineering knowledge

Your Best Engineering Work Shouldn't Stay Buried.

Put past quotes, drawings, pricing and engineering decisions to work on every new RFQ.

  1. Prior drawings
  2. Previous configurations
  3. Approved pricing
  4. New quote
Quote_2415.pdf
Similar job
VH-220 Rev B, 100 pcs, won
Cycle time
38 min, 5-axis, 2 setups
Unit price
$151.80
Engineering note
Finish ream bore, gauge every part

Into RFQ-2611 · Cycle-time baseline, raised to 42 min for 2 added ports

Illustrative records and values.

Product demo · illustrative walkthrough

Received. Checked. Costed. Approved. Quoted.

One RFQ from inbox to quote, with every engineer sign-off. Illustrative data.

Goal: Quote a 120 bpm bottle filling and capping line, engineer-approved, before the customer deadline.

Day 1
Day 2
Day 3
Day 4
Day 5
Day 6
INTAKEDay 1 · 08:12 am

HorizonStack · shared inbox

rfqRFQ-2417
attachmentsspec.pdf, layout.dwg, 2 emails
line_typefill + cap + label
target_rate120 bottles/min
dueday 6

Full workflow timelines

Packaging line

Goal: Quote a 120 bpm bottle filling and capping line, engineer-approved, before the customer deadline.

Day 1, 08:12 am
INTAKE: RFQ received. Source: HorizonStack · shared inbox.
Day 1, 08:31 am
INTAKE: Requirements extracted. Source: HorizonStack.
Day 1, 10:05 am
ENGINEERING: Similar projects retrieved. Source: HorizonStack.
Day 2, 09:40 am
ENGINEERING: Technical risks flagged. Source: HorizonStack.
Day 2, 02:18 pm
INTAKE: Customer clarification received. Source: HorizonStack · email.
Day 3, 11:02 am
ENGINEERING: Configuration proposed. Source: HorizonStack.
Day 3, 03:30 pm
COSTING: Preliminary BOM built. Source: HorizonStack.
Day 4, 10:44 am
COSTING: Supplier inputs received. Source: HorizonStack · email.
Day 5, 09:15 am
PROPOSAL: Proposal drafted. Source: HorizonStack.
Day 5, 04:20 pm
PROPOSAL: Engineer approval. Source: Applications engineer.
Day 6, 09:02 am
PROPOSAL: Quote sent to customer. Source: HorizonStack · email.

Robotic palletizing

Goal: Respond to a distributor RFQ for an end-of-line palletizing cell with a validated layout.

Day 1, 09:20 am
INTAKE: RFQ and drawings received. Source: HorizonStack.
Day 1, 11:40 am
ENGINEERING: Reach and payload checked. Source: HorizonStack.
Day 2, 10:10 am
ENGINEERING: Footprint conflict flagged. Source: HorizonStack.
Day 2, 03:05 pm
ENGINEERING: Cell layout configured. Source: HorizonStack.
Day 3, 11:30 am
COSTING: BOM and estimate prepared. Source: HorizonStack.
Day 4, 10:00 am
PROPOSAL: Proposal and layout drafted. Source: HorizonStack.
Day 4, 03:45 pm
PROPOSAL: Engineer approval. Source: Applications engineer.
Day 5, 09:10 am
PROPOSAL: Quote sent to distributor. Source: HorizonStack.

Industrial components

Goal: Answer a multi-part RFQ for custom actuators with a priced, compliance-mapped quote.

Day 1, 08:05 am
INTAKE: Multi-part RFQ received. Source: HorizonStack.
Day 1, 09:30 am
ENGINEERING: Catalog match. Source: HorizonStack.
Day 1, 01:15 pm
ENGINEERING: Prior pricing retrieved. Source: HorizonStack.
Day 2, 10:20 am
COSTING: Pricing assembled. Source: HorizonStack.
Day 3, 09:40 am
PROPOSAL: Quote and compliance matrix drafted. Source: HorizonStack.
Day 3, 02:10 pm
PROPOSAL: Engineer approval. Source: Applications engineer.
Day 4, 08:55 am
PROPOSAL: Quote sent. Source: HorizonStack.
Industries

Built for How Industrial Teams Quote.

Illustrative examples, not customer deployments.

Engineer checking a partially assembled machine frame

Industrial Machinery

Configure equipment, technical options and proposal pricing.

Example RFQ

Bottle filling and capping line, 120 per minute

  1. InputLine spec PDF, layout drawing, 2 customer emails
  2. Technical AnalysisCapper rate above standard model, washdown rating, footprint
  3. Quote-Ready OutputConfigured line, 142-line BOM and proposal pricing
View workflow
Quote pipeline

See Every Open Quote at a Glance.

Illustrative week of RFQs.

  1. New RFQs
    12
  2. Qualified
    9
  3. Engineering
    6
  4. Quote ready
    4
  5. Submitted
    7
Walkthroughs

See It Work on Real Industrial Problems.

Illustrative walkthroughs, not customer case studies.

RFQ-4410 · quote linesIllustrative
Quote lines for RFQ-4410
PartDescriptionQtyPriced from
ACT-220-SLinear actuator, 220 mm stroke40catalog
ACT-220-XATEX variant, zone 212catalog + mod
BRK-15Mounting bracket, stainless52catalog
CST-9ACustom end casting12supplier quote
SEAL-IP67IP67 seal kit52catalog
Engineer approved27 lines · compliance matrix attached
Machining RFQ

27 machined parts, priced line by line.

Input
Drawing pack, quantities, 3 material callouts
Quote-ready output
Per-line cost build-up and quote draft for review
RFQ-2417 · requirementsIllustrative
Requirements extracted from RFQ-2417
FieldExtracted value
Line rate120 bottles/min
Container500 ml PET, 28 mm cap
ProductStill water, ambient
Footprint14.0 x 4.5 m max
Guarding classNot specified
UtilitiesNot specified
DeliveryQ3, site in Lyon
2 gaps · clarification email drafted38 fields total
Equipment configuration

A line spec turned into a configured machine.

Input
Spec PDF, layout drawing, 2 customer emails
Quote-ready output
Requirement list, open questions and configuration
RFQ-3088 · technical reviewIllustrative
  • Payload14 kg case + 6 kg gripper vs. 70 kg ratedpass
  • Reach1.8 m stack height within envelopepass
  • Cycle time18 cases/min vs. 22 maxpass
  • FootprintSafety fence crosses column line C4flag
  • SafetyLight curtain spec, ISO 13855 distancereview
Routed to applications engineer with layout markup
Automation project quote

A robot cell checked against the floor plan.

Input
RFQ, case dimensions, plant layout
Quote-ready output
Feasibility checks, layout notes and integration quote
Integrations

Works With the Systems You Already Use.

Activate one out of the box. Or we'll build it for your stack.

ERP

  • Oracle NetSuite
  • SAP
  • Epicor
  • Infor

PLM / CAD

  • SolidWorks
  • Autodesk
  • Onshape
  • CAD PLM

Operations

  • Microsoft 365
  • Google Workspace
  • Slack

Financing

  • Equipment lessors
  • SBA 504 lenders
  • Captive OEM finance
Trust and control

Engineers stay in control of every quote.

HorizonStack prepares the work. Your team makes the decisions.

  • Engineer approval

    Technical and commercial decisions are reviewed and approved by your engineers before anything reaches a customer.

  • Scoped access

    HorizonStack only sees the systems and folders you connect, governed by your existing permissions.

  • Full audit trail

    Every extraction, rule applied, price and edit is traced to its source document and the person who approved it.

  • Your rules, applied

    Pricing, margin and engineering rules are set by you. Anything outside them is routed to a person.

Stop Losing Jobs to Slow Quotes.

See how HorizonStack helps your team respond faster and pursue more opportunities.